Buildings Projects
Laguna Honda Replacement Program
Project Description: Turner construction was hired as the general contractor for the construction of the Laguna Honda Replacement Project. During construction, the contractor submitted a $50 million claim against the City. The City has determined that it is necessary to retain a constructions claims and litigation consultant and expert witness to perform services for this claim.
Location
Years Worked:
Services Provided
Cost:
Zuckerberg San Francisco General Hospital and Trauma Center – Hybrid MRI/IR Project
Project Description: The Work under this contract is to purchase and installation of all pertinent equipment, and construction for Hybrid MRI/IR Rooms and their supporting rooms in Surgery area of Hospital’s Basement 1 Level. The scope of work involves partitions, ceilings, floors, dampening columns, electrical, low voltage and telecommunication, mechanical, plumbing, medical gas hookup, fire alarm and fire sprinkler (including VESDA) alterations, hazardous materials (lead) abatement, radio frequency and magnetic shielding, and construction barriers as noted in the specifications and drawings. This work is to be reviewed by the Office of Statewide Hospital Planning and Development (OSHPD).
Location
Years Worked:
Services Provided
Cost:
777 Hamilton Apartments
Project Description: 777 Hamilton is a multi-family project consisting of (7) three story ground up apartment building; with a total of (195) wood-framed units above post tension slab-on-grade foundations. With parking on-grade and tuck under garages. The site work consist of site concrete, paving, outdoor kitchen and spa, landscape and landscape accessories.
Location
Years Worked:
Services Provided
Cost:
California Men’s Colony Health Care Facility Improvement and West Facility. Emergency Generation System Upgrade
Project Description: The Work Sites are located on California State Prison property at California Men’s Colony (CMC) in San Luis Obispo. The health care facility Improvement includes the construction of a new East Facility Primary Care Clinic and Health Care Administration, an New Pharmacy and Laboratory Building, New East Facility Administrative Segregation Unit (ASU) Primary Care and ASU-EOP Mental Health Clinic. The total area of work is 11,000 square feet. The project is LEED silver. The project also includes an upgrade of the Emergency Power Generator System.
Location
Years Worked:
Services Provided
Cost:
Alteration at Warm Springs Elementary School
Project Description: This project included associated architectural, structural, mechanical, plumbing, sheet metal, electrical, resinous flooring, concrete and painting work. In general the work involves repair and re roofing of buildings, replacing and adding HVAC units, remodeling existing and adding site restrooms to meet ADA requirements, an accessible ramp and concrete apron offset sideway with new passenger loading zone, provision of a new campus wide fire alarm system, upgrade to the site emergency lighting and provision of backup emergency lighting for interior assembly areas, and new electrical service and switchgear for the site.
Location
Services Provided
Cost:
Pier G, Berths G230-G236 Terminal Redevelopment North Slip Backlands Development
Project Description: This project consisted of the demolition, removal of marine building, electrical house, removal and installation of new trench drain, electrical and water lines, construction of new electrical substation. The project is spread within 24 regions with distinctive milestones and constraints.