Transportation Projects

BART Earthquake Safety Program Parking Structures Retrofit

Project Description: This project involved concurrent and overlapping retrofits of the parking structures at the El Cerrito del Norte, Hayward, Walnut Creek, Pleasant Hill, Concord, and Daly City stations. The major elements of work included new micropiles, jet grouting of piers, enlarging footings and grade beams, new shear walls in existing structures, fiber-reinforced polymer wrapping, concrete anchors, and steel jacket wrapping of columns. All work was accomplished without closing the parking garages involved

BART Earthquake Safety Program Parking Structures Retrofit

Location

El Cerrito, Hayward, Walnut Creek, Pleasant Hill, Concord, Daly City, CA

Years Worked:

2009-2011

Services Provided

Construction Management

Cost:

$14.6M
San Bernardino SBX E Street

San Bernardino SBX E Street

Project Description: The SBX E Street is the first of-its-kind express service to be constructed in the Inland Empire. It begins with an intermodal public transit system in the San Bernardino Valley that will reduce vehicle congestion while providing the public an environmentally friendly alternative that is sophisticated, cost effective, and time efficient. The 15.7-mile corridor spans between northern San Bernardino and Loma Linda. It will include 16 art-inspired stations at key university, government, business, entertainment and medical centers as well as four park-and-ride facilities. The work consists of the construction of the SBX E Street Corridor Bus Rapid Transit (BRT) Project within the Cities of San Bernardino and Loma Linda, California; and includes widening, reconstructing and rehabilitating existing roadways, the construction of exclusive BRT roadway lanes, the construction of roadway drainage improvements, the construction of curbs, gutters, sidewalks, landscaping, irrigation and urban design treatment, the construction and relocation of electrical systems, communication systems and related appurtenances, construction of 23 complete BRT stations, relocation and addition of traffic signals (temporary and permanent), construction of transit signal priority system, construction of complete park-and-ride facilities, relocation of street lighting, sewer line improvements, storm drain improvements, relocation of water lines, improvements and additions t

Location

San Bernardino, CA

Years Worked:

2011-2014

Services Provided

Construction Management

Cost:

$80M

Tasman Drive Parking Structure

Project Description: The Tasman Drive Parking Garage consists of a six-level, 1,812-stall parking structure and adjacent site improvements. The structure is a cast-in-place reinforced concrete structure, and includes infrastructure installation to accommodate 24 electric vehicle charging stations, photovoltaic panels on the roof level and an outdoor plaza. This project is located between the Santa Clara Golf & Tennis Club, Great America Parkway, the Convention Center Complex and the future site of the San Francisco 49ers Stadium

Tasman Drive Parking Structure

Location

Santa Clara, CA

Years Worked:

2012-2013

Services Provided

Construction Management

Cost:

$24M
Bart Parking Structures Retrofit

Bart Parking Structures Retrofit

Project Description: This project had work in progress at six parking garages, each with similar scopes to retrofit the existing facilities to meet current seismic standards. All records for the project need to be kept under separate files. We performed the duties of Office Engineers and Schedulers wherein we were responsible for receiving, logging and tracking of correspondence, submittals, RFI’s and other change related documents.

Location

Dublin, CA

Services Provided

Construction Management

Cost:

$12M

I-680 Smart Carpool Lane, HOV/HOT Lane

Project Description: This project is for the improvement of the highway system by including High Occupancy Toll (HOT) / High Occupancy Vehicle (HOV) Lanes to relieve congestion along the I-680 corridors. It includes roadway improvements on the highway systems along Alameda, I-680 corridor, and Highway 92.

I-680 Smart Carpool Lane, HOV/HOT Lane

Location

Oakland, CA

Years Worked:

2007-2009

Services Provided

Construction Management

Cost:

$232.5M
Folsom Railroad Parking Garage

Folsom Railroad Parking Garage

Project Description: This project is for the design and construction of a four story parking structure situated at the corner of Reading Street and Leidesdorff Street on the property known as the Railroad Block. This will provide approximately 315 parking spaces including retail shops and a bike station that will also feature a large clock tower.

Location

Folsom, CA

Years Worked:

2006-2007

Services Provided

Construction Management

Cost:

$12M

Posey/Webster Tube Seismic Retrofit

Project Description: The Posey and Webster Street Tubes are two immersed tunnels carrying vehicular traffic between Oakland and Alameda in the San Francisco Bay Area, California. Caltrans, the California Department of Transportation, under the seismic retrofit program, determined that the structures would be subject to liquefaction damage during a 7.25M level event along the Hayward Fault. Subsequently, a consortium led by Parsons Brinckerhoff of San Francisco, California was retained by Caltrans to carry out an extensive seismic study on the two immersed structures and to provide recommendations for the seismic retrofit of the two tubes. Tasks included performing a detailed seismic evaluation of the sites, developing and presenting alternative retrofit strategies.

Posey/Webster Tube Seismic Retrofit

Location

Alameda, CA

Years Worked:

2002-2005

Services Provided

Construction Management

Cost:

$44M
1-80/580 Interchange

1-80/580 Interchange

Project Description: The I-580/Castro Valley Interchange Improvement Project proposes to improve mobility within Castro Valley, as well as to improve access between I-580, the Castro Valley Business District, and the Castro Valley Bay Area Rapid Transit (BART) Station. The project includes construction of a new westbound off-ramp to Redwood Road, a new eastbound on-ramp from Redwood Road, and a new eastbound off-ramp to Grove Way. Also included are removal of the existing eastbound off-ramp to Center Street, removal of the existing westbound on-ramp from Castro Valley Blvd. just west of Center Street; and construction of a new auxiliary lane between the new Redwood Road on-ramp and the Grove Way off-ramp.

Location

Alameda, CA

Services Provided

Construction Management

Cost:

$22M

BART Warm Springs Extension

Project Description: The Warm Springs Extension will add 5.4-miles of new tracks from the existing Fremont Station south to a new station in the Warm Springs District of the City of Fremont, with an optional station to be located approximately midway, in the Irvington District.

BART Warm Springs Extension

Location

Fremont, CA

Years Worked:

2013-2016

Services Provided

Construction Management

Cost:

$300M
Hayward Maintenance Complex

Hayward Maintenance Complex

Project Description: The Hayward Maintenance Complex project consisted of acquisition and improvement to three properties on the west side of the existing Hayward Yard and the construction of additional storage tracks for a maximum of 250 vehicles on undeveloped BART property on the east side of the Hayward Yard. The project site is zoned for industrial uses and the proposed activities would be consistent with this zoning designation.

Location

Hayward, CA

Years Worked:

2010-2013

Services Provided

Construction Management

Cost:

$400M

New Brunswick Toll Rd., Design Build Project

Project Description: The 195-kilometre road between Fredericton and Moncton is a four-lane divided road, replacing the two-lane Trans-Canada highway built in the 1950s.

New Brunswick Toll Rd., Design Build Project

Location

Canada

Years Worked:

1998-2001

Services Provided

Construction Management

Cost:

$800M